- 项目的成本绩效指数是这意味着你应当____
- Which item is not a basic element of a contract?
- Cost controls can be best described by which of the following?
- If the project was supposed to have $1.000worth of work accomplished, but only completed $850 worth of work, what is the Scheduled Variance?
- Your company has established a reward and recognition system for its project management professionals. Project cost performance is used as a criterion to determine rewards. What should you do to ensure that rewards reflect actual performance?
- In a project environment, functional managers are responsible for:
- Contained within the first step of a five step process to determine the risk analysis of the project’s risk events, a process of ________ is performed to see if the risk should be included or excluded as part of the project scope
- A project of 2 million has an adverse event that has the probability of 50% of occurrence and a potential loss of $20,000. This represents an expected negative value of:
- The assigned values of risk for a project is best accomplished through a structured methodology that ensures all project elements are evaluated The project tool that is best suited for the structured analysis of the project risk is the:
- The Program Evaluation and Review Technique (PERT) is a method of scheduling projects. In the context of risk, PERT is better than the Critical Path Method because it deals with the _______ associated with ________.