问题

工作排序内容不包括()。

A:工作清单
B:逻辑关系
C:假设条件
D:网络图
正确答案是:
标签: 排序 , 网络图 , 逻辑关系
同类题型

It is possible to transfer risk through the use of insurance If the estimated probability of damage occurring to an asset is 2 percent, the insurance cost is $5,000, and the total worth of the asset is $300,000, is it worth insuring the asset?

A project of 2 million has an adverse event that has the probability of 50% of occurrence and a potential loss of $20,000. This represents an expected negative value of:

As a project manager,you can assign any one of two team members to a highly coveted task.Both are equally capable,but one of them is a member of your in-group.To the other one,you have far more distance.How should you behave?

对一个任务进行进度估算时,A是乐观者,估计是6天完成,B是悲观者,估计是24天完成,C是有经验者认为最有可能是12天完成,那么这个任务的历时估算是介于10天到16天的概率是()。

影响与项目有关的工作关系的要素为()